Skip to content

Timeline ​

Qlik Cloudsupported Qlik Sense Enterprisesupported Power BIsupported Licenserequires Soterre

The Timeline tab shows the Soterre history of the artifact you have open — a Qlik app or a Power BI report — and lets you run the most common Soterre operations without leaving the BI tool. It is the tab the popup opens on.

Whatever you have open, the timeline is a list of change events recorded by Soterre, newest on top. Use the search field to find an object or a comment, and Filters to narrow the list by Tags, Artifact (object) or User Id. That much is identical on both platforms; what the events describe is not, so each platform is walked through separately below.

For Qlik Sense and Qlik Cloud

The timeline of a Qlik app lists every object Soterre versions: sheets, master items, variables, bookmarks, the load script and the app properties.

Timeline of a versioned Qlik app

Timeline filters

Filters: Tags, Artifact and User Id

Reading a change event ​

ElementMeaning
v4, v5 …The version number of the changed object
Added / Changed / DeletedWhat happened to the object in this event
Object name and typeFor example Customers · QlikSheet, vDateSelections · QlikVariable
UserThe Qlik user who made the change, as Soterre recorded it
CommentThe comment of the change event, if any
DateWhen Soterre recorded the version

Version Now ​

+ Version Now asks Soterre to run Find Changes on the current app. Soterre compares the app with its last version and records a new one if anything changed.

Version Now form for a Qlik app

  • Comment — the note applied to the new change events.
  • Tags — Soterre tags for the new version.
  • Issue tracking — a Project and Issues from the ticketing system integrated with Soterre, to link the version to tickets.

Click Version Now; the timeline refreshes when Soterre has finished (the status bar shows the progress).

Apps that are not versioned yet ​

If Soterre has never versioned the open app, the tab says so and offers Yes, version it. The same form appears; after the first run the timeline lists every object of the app as Added.

A Qlik app Soterre has not versioned yet

Restore ​

Restore on a card asks Soterre to bring the app back to that version. The operation runs in Soterre and changes the app immediately; version the current state first if you may want to return to it.

Edit a change event ​

Edit on a card opens the event in place:

Edit change event

  • Comment — describe the change for your colleagues.
  • Tags — add or remove Soterre tags.
  • Issue tracking — link the event to tickets of the integrated project.

Click Edit Change Event to save, or < Timeline to go back.

For Power BI

Open a report in the Power BI service and click the extension icon: the popup opens on the same Timeline tab. The events are the Soterre versions of the report and its contents — pages, visuals and measures.

Timeline of a versioned Power BI report

The tab bar on a report holds Timeline, Deployments and Tools; the Qlik-only tabs are hidden

The search field and the Filters dropdown (Tags, Artifact, User Id) work exactly as they do for an app.

Reading a change event ​

ElementMeaning
v22, v23 …The version number of the changed object
Added / Changed / DeletedWhat happened to the object in this event
Object name and typeFor example dev-reportTest · PowerBiSaasReport
UserThe Power BI account that made the change — often the service account that syncs the tenant with Soterre
CommentThe comment of the change event, if any
DateWhen Soterre recorded the version

Version Now ​

+ Version Now asks Soterre to run Find Changes on the current report, exactly as it does for a Qlik app: Soterre compares the report with its last version and records a new one if anything changed. The form takes a Comment, Tags and an Issue tracking project with its issues.

Reports that are not versioned yet ​

If Soterre has never versioned the open report, the tab says so and offers Yes, version it. After the first run the timeline lists the report's objects as Added.

Restore ​

Restore on a card asks Soterre to bring the report back to that version. As with Qlik, the operation runs in Soterre and changes the report immediately.

Edit a change event ​

Edit opens the same in-place editor: Comment, Tags and Issue tracking links. Click Edit Change Event to save.

Requirements ​

The Power BI tenant must be connected to Soterre (3.1 or later) and the report versioned there. Power BI Desktop is not supported — the extension works on reports opened in the Power BI service (app.powerbi.com).

Soterre BI Ops Analytics by Motio